General details of project
1.General structure
1.1. General structure by reenforced concrete.
1.2. The post is 20 cm. wide.
1.3. The foundation is on the structure that can protect a house from
damaged by subsidence.
1.4. Wall by Q-CON block product size 7 x 20 x 60 unit benefit for
power
savings , and protect exterior heat
and noise.
1.5. Roofing features aluminum uses for protecting extreme heat.
1.6. Choice of luxury style roof and color’s by C-PAC MONIA (Triple
tone).
2.Termite control system.
2.1. Protect the termite by using the underground pipeline system that are
under the ground , not
necessary to break the floor , convenience for send
the transferring . The company provides a 3-year
guarantee against the
termites.
3.Design and decoration.
3.1 First flooring form is granite tile.
3.2 Second flooring form is tabak wood.
3.3 Bed room door / bathroom door / store room door made of teak wood
every
tile.
3.4 Door pane and window pane of a house by AMIGO (vinyl products) . The wall ensure protection form
high temperatures chemical and product
shrinkage. Fireproof , waterproof , soundproof and long life.
3.5 Counter in bathroom and kitchen are granite.
3.6 The tile on the floors and the walls are luxury and quality
made.
3.7 Toilet facilities from Cotto.
4.Public Utility System.
4.1 Confident & safety with 24 hours security
4.2 Comfortable with water system from water main (every rooms, we exclude
cools water and warm
water)
4.3 Swimming pool and Center Park.
4.4 Light system designed in resortstyle.
4.5 Electricity system for every house is situating installation.
4.3 Street in this project is reenforced concrete wide 7 meters (excludefootpath) and long approximately
275 meters.
4.4 We reserve water under the ground for using.
Special Promotion.
- Free for air conditioner and some kitchen furniture.
- Direct phone from TOT ,1 number.
- Security system for every house.
- We arrange the beautiful garden for every house.

Managed by Viangping Innovation Company Limited.
Managing director is
Mr.Sirisak Prueksoontorn, registered under No. 15254600441 of company
limited. Register capital is 20,000,000 bath, dated on October 7, 2003 . The
headquarter is on 52 M.5 Chiangmai – lumpans Rd. Changphuank Muang
Chiangmai .The project’s name is Prueksathong Village .The office
location is on 241 M.6 Sunpeesua Muang Chiangmai tel. / fax. : (053)261285 , 06 – 9124829
1.The housing estate
The land title deeds No.96209 , 97001 (some part) . Land No. 97
, 86
Tombol Sunpeesua Amphor Muang Chiangmai . The total project area is
approximately 8-3-61.3 rai. Measuring & Dividing in 30 detail plots , 29
plots for sale and 1 plots for sale.
1.1. The plots that for sale 29 plots have 6-3-57.5 rai . The details
are :
1.1.1. 29 plots for sale fully single house.
- The largest plots is 233.5 sq. wah (No.29)
- The smallest plots is 67 sq. wah (No.15)
1.2. 2 plots for public utility.
1.2.1. 1 public park is 148 sq.wah
1.2.2. 1 plots for street in the village 1-2-75 rai
2.The estate adjustment
Adjusted by filling the crushing soils and crushing on them with
the
steam roller. Then smoothed it by the tractor . The level of the ground is
higher than the level of the street.
3.The provision for public utility
3.1 The street – The company provide 1 line for public utility . The
details of size are:
3.1.1.The reinforce concrete with 9.4 m.
3.1.2.The drainage – Drain the water out by using the reinforce concrete
pipe’s diameter are 0.4 , 0.5 and
0.6 m. The drainpipe is used for draining he rain and the used water from the estate, 1 well plot or
every
9 m.
Then drain the water out to the public marsh.
3.2.All of the water supply are designed and managed by the provincial
water works.
3.3.All of the electricity system are designed and managed by the
provincial electrical works.
4. Public Utility and Public service
4.1 We have public park for 148 square wahs.
4.2 We have a land 1 plot in this project.
4.3 We have security guard.
4.4 We have a light to be lit up in main road.
4.5 For cleanliness in this project, we have a worker to impose the garbage.
5.Plan and the time to impose maintenance public utility cost.
5.1 Public utility maintenance
We will maintenance the damage of footpath, drainage ditch, Public
Park,
electricity system, water system by an experiences engineer.
5.2 Public service
5.2.1 High a security & safety in this project.
5.2.2 We will impose the garbage for every house from Viangping Innovation
Company Limited.
- Providing a garbage can, 1 can per 1 house.
- Providing a garbage can in public area and Public Park.
5.2.3 We have a light to be lit up in the main road and connect with
electricity center for fix it when can not
use or damage.
5.2.4 We look after for cleanliness in this project.
5.2.5 We have the gardener to look after the Public Park.
5.2.6 We will dredge the pipe when it clogged up.
6. The times to proceed this project.
After we permitted from Board of allotment land Chiang Mai, we begin to
proceed this project.
7. Right and Obligation of customer.
1. We will provide the financial loan for buying a house and land.
2. We will have the security service including cleanliness of project.
3. The buyer can be a board of this project by election from the
resident in
Pruek sa thong houses in order
to improve public utility, general service
and make a comfortable for all Prueaksathong’s resident.
4. In the juristic person to establish we will let the buyer know by
mailing to every buyer after we sale more
then 50% of project.
5. Other right depends on law.
8. The time to complete of this project.
This project will complete in 3 years after the day we set a permit
from
Board of Allotment Land Chiang Mai.
9. Guarantee for Public utility.
We provide Siam Commercial Bank to guarantee Public utility.
|